Description (CNA)
A low privileged attacker can set the date of the devices to the 19th of January 2038 an therefore exceed the 32-Bit time limit. This causes the date of the switch to be set back to January 1st, 1970.
Affected (CNA)
| Vendor / product | Versions |
|---|---|
| WAGO / Fully Managed Switches 0852-0303 | affected all |
| WAGO / Fully Managed Switches 0852-1305 | affected all |
| WAGO / Fully Managed Switches 0852-1305/0000-0001 | affected all |
| WAGO / Fully Managed Switches 0852-1505 | affected all |
| WAGO / Fully Managed Switches 0852-1505/0000-0001 | affected all |
| WAGO / Lean Managed Switches 0852-1812 | affected all |
| WAGO / Lean Managed Switches 0852-1812/0010-0000 | affected all |
| WAGO / Lean Managed Switches 0852-1813 | affected all |
| WAGO / Lean Managed Switches 0852-1813/0000-0001 | affected all |
| WAGO / Lean Managed Switches 0852-1813/0010-0000 | affected all |
| WAGO / Lean Managed Switches 0852-1813/0010-0001 | affected all |
| WAGO / Lean Managed Switches 0852-1816 | affected all |
| WAGO / Lean Managed Switches 0852-1816/0010-0000 | affected all |
CWE
CWE-190